Spread over a total area of ~40 acres, the project demanded planning and design of an industrial unit to manufacture 2-wheelers for a multinational brand, “Vespa”. It consisted of multi disciplinary structures required the production supported with utility buildings, administration bldg. , canteen and allied facilities.
With the gradient of 9m over the entire expanse of the site, the planning strategy worked around designing the campus in response to the natural gradient of the